A reflection of quality and class

Roeselare-based 100% LIGHT offers lighting fixtures with designs that are as clean-lined as they are functional, for both residential and professional customers. The fast-growing company set out to find a new building that reflected its image. It found an impressive design by Epure Architects and a skilled contractor in Beeuwsaert Construct.
100% LIGHT works on residential, commercial and outdoor projects. The company has since grown into one of the leading businesses in the sector, exporting lighting fixtures to more than eighteen countries worldwide. To keep pace with its rapid growth, the company sought a new headquarters that would reflect the modern, sustainable and detail-oriented character of its products. “The design by the architect, the choice of materials in the building and the finish, right down to the interior, have all contributed to a very successful result,” says Jeroen Beeuwsaert, managing director of Beeuwsaert Construct.

Brussels-based architecture firm Epure designed a contemporary showroom, office and production hall, along with loading bays equipped for an overhead crane. The building stands out along Roeselare’s ring road. Main contractor Beeuwsaert Construct, which specialises in industrial construction, was pleased to take on the stylish design. Beeuwsaert translated the architects’ plans into a 3D structural design, with careful consideration of the materials and structural stability. “Steel was, of course, the obvious choice of building material,” says project manager Mathias Despriet. “The hall’s structure includes IPE 300 and IPE 600 column sections, as well as three trusses with a 33-metre span, which were welded in the workshop and assembled on site. The frame contains around 124,500 kilograms of S235JR and S275J0 grade steel.”

Steel elegance
The floating box-in-box structure for the offices and showroom uses as few galvanised columns as possible. These are fabricated sections, underscoring the project’s slender design. The office appears to slide out of the warehouse, while the glazed entrance hall takes centre stage. The façades are clad in black ArcelorMittal Promisol 5100 insulated sandwich panels. To improve acoustics in the production hall and offices, perforated galvanised steel decking from Joris Ide was chosen. The roof decking is topped with a vapour barrier, insulation and a roofing membrane. The cantilever supported by the steel structure is made of timber. The surrounding cladding consists of Alucobond panels, a composite sheet made up of two aluminium sheets with a mineral-filled polymer core.

A spiralling focal point
The steel spiral staircase is the eye-catching feature inside the entrance hall. It was designed and built by Ben Broes and Jakob Lefevre. “The client wanted a circular staircase with a diameter of around 4,600 millimetres, as the structural opening was already in place. It was not originally circular, but octagonal,” says Ben Broes of bvba Dry Ceuninghen, which specialises in design and contracting work to convert existing buildings into homes, covering both structural work and interiors. “We were able to create the outer circle for the suspension by fitting laser-cut flat steel sections to the structural opening.”
The staircase, which is 5,390 millimetres high, has a radius of 2,300 millimetres, a diameter of 4,600 millimetres and weighs 2,500 kilograms. It is built around a central untreated steel tube with a diameter of 508 millimetres, a thickness of 10 millimetres and a length of 5,390 millimetres. The tube has a base plate and was chemically anchored to the foundation beneath the polished floor. A 750-millimetre hole had to be drilled in the floor for this. The 23 treads are made from 6-millimetre blue flat steel, grade S355, bent into a U shape.
“The ends were welded shut and each tread was welded to the column, a task successfully completed by Jakob Lefevre, a specialist in welding and construction work,” Broes adds. “They were then filled with two layers of plywood and a layer of herringbone parquet. The herringbone parquet on the landing continues from one tread to the next and is also used in the lift, giving the floor a consistent appearance. The outer edges of the treads are suspended from brass T-sections mounted on the building’s concrete structure. The upper landing consists of three treads placed side by side. The handrail was rolled into a spiral to match the radius of the staircase. All the steel was simply buffed, with no further treatment.”
Question about this story? Ask your question
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeBuilding and using business premises
- SubjectGeneral
- CompanyBeeuwsaert Construct